Fierro Construction Survey Consultant

Francisco A Fierro Jr Construction Survey Specialist

CAREER ACHIEVMENTS

INDUSTRIAL - HIGHWAY & BRIDGE - ENVIRONMENTAL

Provided Quality Assurance for Survey Department in Soyo, Angola

  • Led teams of Angolans, Congolese, and Filipinos, communicationg effectively total of 32 personnel
  • Stimulate innovative survey practices
  • Assured 100% of all foundation bolts set within 2mm and 3mm tolerance, requiring zero refitting

Troubleshooting And Implementing High Quality Surveying for Pueblo Power Plant

  • Analyzed field, sub-contractor and in-house procedures
  • Restructured program, directing unique grading process and training operatives in implementation
  • Reduced project costs $500k and helped improve production 30%

Midwest Regional Senior Survey Manager on the St Louis Cardinal Baseball Stadium Foundation Package

  • Seized the opportunity to organize pile driving team, carpenter crews, surveyors, and rod buster teams
  • Kept project three months ahead of schedule
  • Managing 1000+ design changes and saving $2M is estimated back charges

Turning Around Project Two Months Behind Schedule On Chevron Pipeline Project

  • Assertively re-designed piping directional plan
  • Implemented new layout technique
  • Created a pioneering staking methods
  • Served as a liaison with the City of El Paso Engineering Division
  • Completing project two months ahead of schedule

Present New Survey Techniques and Quality Methods to The Greenville Mississippi Cable Stayed Bridge

  • Aggressively re-designed layout plan
  • Developed quantity calculations for concrete placement on floating caisson foundations
  • Developed patented theoretical formula for executing the sinking of caissons or river beds
  • Served as a 2nd Civil-Superintendent for caisson construction

Midwest Regional Senior Survey Supervisor on the Union Pacific Railroad Bridge & Truss

  • Actively re-designed grading plan
  • Set new original stakeout system
  • Helped project's efficiency to three months ahead of schedule
  • Quality monitor for truss to be level and on location as it was floated down river to new abutments

Effectively supported Project And Implementing High Quality Surveying For Missouri I-170 & I-270 Bridge Overpasses Project

  • Analyzed field, sub-contractor and in'house procedures
  • Restructure program, directing unique layout process and procedures
  • Helped reduced project costs and helped improve production 30%

Renovation Design for Piedras Bridge Could Not Be Calculated By City And Contractor Engineering Teams for 6 Weeks

  • Calculated new design in field within 3 days
  • Increased productivity 45%
  • Assured quality of bridge deck to be within 3/8" after concrete placement

Rationalizing Project Five Months Behind Schedule On Exxon Mobile Coal Mine Project

  • Constructively re-designed grading plan
  • Applied an assertive stakeout practice
  • Produced unique staking procedure
  • Finalized 80-acre grading
  • Completing project four days ahead of schedule

Implementing Performance of High Quality Surveying For WSSRAP

  • Dissected field, sub-contractor and in-house procedures
  • Reform program, establishing unique grading methods and training operatives in implementation
  • Maintained exceptional support for 24 sq. acre contaminated cell construction execution

Increasing FUSRAP Project Productivity, Surpassing Expectations

  • Coordinating Surveying for radioactive cleanup superfund projects
  • Created new data reporting system and restructured surveying for superfund sites
  • trained new survey teams for Project's execution
  • Increased productivity 30%
  • Improved data recording to ensure high quality and quantity information

Listed Profiled Projects From $5 million to over $13 billion

 

ENVIRONMENTAL 

Olmstead Illinois,  Ohio River Lock and Dam

St Louis Airport Project Site (SLAPS)

St Louis Downtown Site (SLDS)

EXXON/Mobile Coal Mine Reclaim Project

FEMA -Hurricane Katrina Recovery Levee Project

Weldon Springs Site Remedial Action Project (WSSRAP)

 INDUSTRIAL & HEAVY COMMERCIAL

Angola Liquid Natural Gas Plant (ALNG)

Comanche Unit #3 Fossil Fuel Power Plant                   

St Louis Cardinal Baseball Stadium Foundation Package

El Paso Central Business District 35 Avenues Project

El Paso County Jail Annex

Chevron Pipeline Project

El Paso International Airport Runway Project

HIGHWAY & BRIDGE

Hoover Dam Bridge Bypass Project                                             

Union Pacific Railroad Track & Truss Project                

I-170 & I-270 Bridge Overpasses Project                        

Greenville Mississippi Cable Stayed Bridge Project     

Texas Highway Loop-375                                                                   

Avenidas De Americas (Cordova) International Bridge           

 

Recent Videos

4122 views - 2 comments

Testimonials

  • " Mr. Fierro has been a tremendous asset as a Survey Superintendent for our project. He arrived about midway into our project and re-structured our surveying to be precise and c..."
    Dick Atterberry
    Lead Senior Piping Superintendent, Bechtel Corporation
  • "I have worked with Frank Fierro at the Comanche Unit 3 Power Plant, 750 MW Coal Fired Power Plant. Frank came into this Project to help us recover from the problem of layout er..."
    Andy Rodriguez, PE
    Resident Engineer, The Shaw Group
  • "It gave me great pleasure to congratulate Mr. Fierro for being a part of the team that received the Morrison Knudsen Engineers and Construction 1998 Federal Programs Eagle Award..."
    Douglas E. Steffen
    Project Director, Morrison Knudsen (Currently URS Corporation)